<%@LANGUAGE="JAVASCRIPT" CODEPAGE="1251"%> Use_seal_eng
   
use sealиспользование плоьбы  
 

 

the order of installation of a seal

the control hologram

 

 

 

 

The Seal of Kamayev with the control hologram

THE ORDER OF USE OF THE SEAL


1.1. The order of installation of a seal.
- the Hinged element, for example, a string to pass through the screw of a cover of the counter.
- To combine the ends of a string and to place in flutes (5) in a direction from a cover (4) to short moustaches of an anchor (6)
- To execute on one revolution of a string around of each of short moustaches of an anchor - To deduce a string on other flutes from an opposite side in a direction from short moustaches of an anchor (6) to a cover (4)
- - the Anchor insert into a face aperture of the case, short moustaches of an anchor pass through lateral narrowing, are compressed, and then straightened in internal space of the case and block an opportunity of opening of a seal
- the Case of a seal (1) and a cover (4) anchors paste over with vertically protective number label.
(There are some ways of fastening of a hinged element)

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
   
Hosted by uCoz